Urgensi Penguatan Kedudukan Dispute Board guna Menjamin Kepastian Hukum Proyek Jalan Multi-Tahun
(1) Universitas Lampung
(2) Universitas Lampung
(3) Universitas Lampung
Abstract
Keywords
Full Text:
PDFReferences
Arief, E., & Hardjomuljadi, S. (2025). Kepastian Hukum Penyelesaian Sengketa Kontrak Konstruksi Melalui Arbitrase. 5(4), 3031–3049.
Author, T., Law, C., Access, O., & Attribution, C. C. (2022). AN INTERNATIONAL CONVENTION ON EXPERT DETERMINATION AND DISPUTE BOARDS. 71(September 2020), 697–726. https://doi.org/10.1017/S0020589322000185
Bates, A., Torres-fowler, R. Z., & Llp, P. H. (2019). Dispute Boards : A Different Approach to Dispute Resolution. 198(August).
Bidang, D., Dan, H., Sanggah, P., Penanggung, S., Layanan, J., Sengketa, P., Teknis, P., Sengketa, P., Tahapan, P., Pada, M., Penyelesaian, L., Kontrak, S., Bidang, D., Dan, H., Sanggah, P., Penanggung, S., Layanan, J., & Sengketa, P. (2025). PETUNJUK TEKNIS PENYELESAIAN SENGKETA PADA TAHAPAN MEDIASI PADA LAYANAN PENYELESAIAN SENGKETA KONTRAK PENGADAAN BARANG/JASA PEMERINTAH. 1.
Bunni, N. G., O’Reilly, M., & Ong, C. (2015). The Enforcement of Dispute Adjudication Board Decisions: Persero and the FIDIC Standard Form of Contract. Arbitration: The International Journal of Arbitration, Mediation and Dispute Management, 367–374. http://www.kluwerlawonline.com/api/Product/CitationPDFURL?file=Journals%5CAMDM%5CAMDM2015058.pdf
Capper, P., Sergeant, M., & Wieliczko, M. (2020). THE LAW OF CONSTRUCTION DISPUTES (Philip Britton & Philip Capper (ed.); Third).
Chapman, B. P. H. J. (1996). Dispute Boards.
Chern, C., Sergeant, M., Wieliczko, M., & Chern, C. (2020). CHERN ON DISPUTE BOARDS Practice and Procedure (P. B. P. Capper (ed.); Fourth Edi). Routledge.
Christiawan, R. (2020). Kepastian hukum pelaksanaan kontrak konstruksi. 9(2), 85–94. https://doi.org/10.28946/rpt.v9i2.630
Hardjomuljadi, S., & Asce, A. M. (2020). Use of Dispute Avoidance and Adjudication Boards. 12(2), 1–21. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000431
Imam, M., & Andora, H. (2023). Position of Dispute Board in Construction Dispute Resolution in Indonesia. International Journal of Multicultural and Multireligious Understanding, 10(6), 344–353. https://doi.org/http://dx.doi.org/10.18415/ijmmu.v10i6.4796 Abstract
Lature, K. E. (2018). ANALISIS PENYELESAIAN SENGKETA KONSTRUKSI DI INDONESIA. UNPAR, 30, 211–222.
Laya, A. (2025). Aspek Hukum Perjanjian Kerja Dalam Proyek Bangunan.
Manaek, D. T., Sriwidodo, J., Sinaulan, R. L., & Mustofa, M. E. (2023). Kepastian Hukum Dalam Pelaksanaan Eksekusi Hasil Putusan Lembaga Arbitrase Nasional di Indonesia. Perfecto: Jurnal Ilmu Hukum, 01(2), 45–64. https://doi.org/https://doi.org/10.58977/ijih.v2i1.1 (2) 45-64
Omoto, T. (2024). Navigating Construction Conflicts : The Role of Dispute Boards in Achieving Efficient Resolution. ICCEPM 2024, 6106. https://doi.org/https://dx.doi.org/10.6106/ICCEPM.2024.1296
Pakpahan, A., Saragih, H. R., Wisatrioda, B., & Laia, K. (2025). The Efectiveness of Arbitration Mechanisms in The Resolution Of Construction Disputes In Indonesia : A Critical Analysis of Law No . 30 of 1999 on Arbitration And Alternative Dispute Resolution. 6(1), 803–808.
Plant, F. O. R., Electrical, F. O. R., Building, F. O. R., Works, E., By, D., & Contractor, T. H. E. (2017). Amendments to the FIDIC Conditions of Contract PLANT , AND FOR BUILDING AND DESIGNED BY THE CONTRACTOR.
Priyambodo, M. A. (2021). Mekanisme Penyelesian Sengketa Konstruksi Menurut Undang-Undang Nomor 2 Tahun 2017 Tentang Konstruksi. IBLAM Law Review, 01(03), 173–177.
Sugandi, H., & Saputro, A. (2025). Efektivitas Penyelesaian Sengketa Kontrak Konstruksi di Indonesia dalam Analisis Hukum Implementasi dan Tantangan Proyek Infrastruktur. Jurnal Pendidikan Indonesia, 6(3), 1232–1243.
Sumantri, M. F. A., Sami’an, & Hardjomuljadi, S. (2025). Concurrent Delay and Price Adjustment in Multi-Year Contracts: An Indonesian Construction Law Perspective. SIGn Jurnal Hukum, 6(2), 343–367.
Syarif, M., Ariani, I., Tukimun, Sahari, D., Sari, D. P., & Sulha. (2024). HUKUM KONTRAK KONSTRUKSI (A. I. A. A. Sila (ed.)). TOHAR MEDIA.
Waisapi, J. Y. (2023). THE ROLE OF THE CONSTRUCTION DISPUTE BOARD IN THE SETTLEMENT OF CONSTRUCTION DISPUTES. Eduvest-Journal of Universal Studies, 3(8), 1498–1505.
Wati, D. L., Sarifudin, F., Studi, P., Teknik, M., Tarumanagara, U., Studi, P., Teknik, M., Tarumanagara, U., Studi, P., Teknik, M., & Tarumanagara, U. (2024). Ketidaklengkapan kontrak dan sengketa konstruksi di indonesia. 7(2), 489–502.
Wirawan, I. W. S., & Budiartha, I. N. P. (2022). Multi-Year Contract in Indonesia : Its Validity and Conditions of Its Formation. International Journal of Criminal Justice Science, 17(1), 227–241. https://doi.org/10.5281/zenodo.4756102
Yudhantaka, L., Simamora, Y., & Anand, G. (2023). Binding Power of Dispute Board Judgment in Construction Dispute Settlement. 38(1), 159–170. https://doi.org/10.20473/ydk.v38i1.42717
DOI: https://doi.org/10.34007/jehss.v8i3.2979
Refbacks
- There are currently no refbacks.
Copyright (c) 2026 Journal of Education, Humaniora and Social Sciences (JEHSS)

This work is licensed under a Creative Commons Attribution 4.0 International License.
Journal of Education, Humaniora and Social Sciences (JEHSS)

This work is licensed under a Creative Commons Attribution 4.0 International Public License




